This Multipurpose Dam was a proposed dam that was meant to impound water and to supply water to approximaely 30,000 people, power two hydro-electric power stations and for irrigation to an area of agricultural interest. We were contracted by The Client to establish ground controls at locations recommended by contractor, conduct airborne LiDAR survey of the area, acquire digital aerial photography and perform detailed topographic survey of the areas specified. All the tasks were carried out and deliverables delivered within the specifications of the project.
Client